Wednesday, December 31, 2008

Storm Drains at Upena and Moua Streets in Makaha

On Wed, 12/31/08, Brennon.Morioka@hawaii.gov wrote:

Aloha Maile

Our maintenance engineers as well as our hydraulic engineers will be doing some site inspections along the Farringon corridor during the first two weeks of January since we have received numerous calls about similar problems along the entire stretch. They will be looking at intermediate steps we can take to address ponding and such. However, there is not much that could have been done for an event of such magnitude and intensity as the recent rain event a couple of weeks ago. That storm far exceeded any of our design standards. I will keep you informed about what we find.

Aloha
Brennon

No comments: